Transneft Siberia has obtained a permit for commissioning gas supply systems of the facilities of Zapolyarye-Purpe oil pipeline


Transneft Siberia has obtained a permit for commissioning gas supply systems of the facilities of pipe-end pump station No. 1 (PEPS-1) and booster pump station No. 2 (PS-2) of Zapolyarye-Purpe oil trunk pipeline.

zapolarye-purpe
  • Facebook
  • Twitter
  • Google+
  • Pinterest
  • LinkedIn
  • Gmail
  • VKontakte

This was reported by the company on July 4, 2016. The permit has been issued by the Department of Construction and Housing Policy of Yamalo-Nenets Autonomous Area in accordance with Article 55 of the City Planning Code of the RF (Russian Federation).

As part of construction of gas supply facilities of PEPS-1, 2,310 metres of high-pressure gas offshoot pipelines, an autonomous gas distribution station (AGDS) building, 354 metres of external gas pipelines from the AGDS to the boiler house, 4 lightning-conductors, a safety valve unit site, 2,770 metres of cathodic protection networks have been constructed.

Among the gas supply facilities of PS-2, 14,100 metres of high-pressure external gas pipeline from the tie-in point of the operating gas pipelines to cabinet-type gas distribution station (CTGDS), a site and a block box of CTGDS have been installed, 1,700 metres of intrasite power networks have been laid.

Gas supply of PEPS-1 and PS-2 is provided for on a continuing basis from Khalmerpayutinskoye field – Pyakyakhinskoye field gas trunk pipeline.

Source: neftegaz.ru

Author: Hassan Khazaal

Share This Post On

Submit a Comment

Your email address will not be published. Required fields are marked *

Top

Pin It on Pinterest

Share This

Share This

Share this post with your friends!